Download free guide on "How knowhow reduces LCOE in offshore wind"

In this free guide, you will learn more about five stages on how to reduce the levelised cost of energy (LCOE) of the wind farm installation.

The lifecycle of an offshore wind farm covers the complete process from the initial planning to the operation and finally decommissioning of the wind turbines.

These phases are similar to those in offshore oil and gas, including surveys, field preparations, subsea construction, installation and commissioning, transfer of personnel and equipment, and operational service.

Ulstein has developed vessels for the full range of activities in the offshore wind industry, from the survey vessels used in the planning and development phases, to the service preparation vessels used during the operation of the wind farm.