FS Cygnus 10 year survey ULS 03122 FS Cygnus

FS Cygnus

Afterwork history

Yard service

2024-11 Ulstein Verft carried out the 10-year renewal of the offshore vessel. 
All tunnel thrusters have been replaced (replacement units). The propeller shaft on both sides was pulled out and overhauled. The same with the propellers and both rudders. 

The shipyard has painted the entire hull, dismantled the propellers, and assisted with the installation. Additionally, Ulstein has performed various electrical work, piping work, equipment and steel work, as well as machinery work – Overhaul of pumps and coolers.

Ta kontakt

Martin Hansen DSC4357 comp bw

Martin Sundgot Hansen

Beskrivelse
Sales Manager Aftermarket
Tilknytning
Ulstein Verft AS
Hans Ole Låbakk BW

Hans Ole Låbakk

Beskrivelse
Area Sales Manager Aftermarket
Tilknytning
Ulstein Verft AS