Windea TBN

Service Operation Vessel (SOV) for the offshore wind industry, also attractive for work in O&M (Operation and Maintenance) or construction support.

Vessel type

SOV

Design

SX195

Built by

Ulstein Verft AS

Year

2020

Owned by

Bernhard Schulte Offshore

Designed by

Ulstein Design & Solutions AS

Operated by

Bernhard Schulte Offshore

Principal dimensions

Length:
93.4 m
Beam:
18 m
Accommodation:
120 POB

Note: Subject to selected variant configuration

Capacities

Featured solutions

The design is modified to fulfil the GE Renewable Energy tender requirements and the ship owner’s special choices of mission equipment. It has a large, centrally positioned walk to work motion compensated gangway & elevator tower for personnel and cargo transfers. Furthermore, a 3D compensated crane capable of 2-ton cargo lifts is available. The optimised on-board logistics includes large storage capacities, of which half is under roof in a controlled environment, and stepless approach to the offshore installations. The vessel is equipped with a fuel-efficient drive system including battery-solution from ULSTEIN. With all main equipment and operations in the aft ship, the vessel will naturally operate astern while in-field. Keeping the X-STERN® towards the weather, there will be no slamming, noise or vibrations caused by the waves. The crew will get complete rest between shifts.

Ship history

Contracted on 31 July 2018. The vessel will support the maintenance work of GE Renewable Energy at the German wind farm Merkur Offshore.The project has been developed in cooperation with WINDEA Offshore, which is the Bernhard Schulte’s affiliate for offshore wind projects. The vessel is Ulstein's third offshore wind vessel for Bernhard Schulte, the two first being Windea La Cour and Windea Leibniz.

Steel cutting: 10 September 2018.