
Steel cutting ceremony for Acta Marine’s CSOV
The steel cutting ceremony of the first of two next-generation Methanol MDO/HVO powered DP2 Construction Service Operating Vessels for Acta Marine was arranged on 18 January 2023 at Tersan. The SX216 design of the vessel has been developed exclusively and in close collaboration with Ulstein Design & Solutions AS.
Read more