Far Symphony

Platform supply vessel of the ULSTEIN P105 design with large tank capacities, a deck load capacity of 2,840 tonnes and a deadweight of close to 5,000 tonnes.

Vessel type

Platform supply

Design

P105

Built by

Ulstein Verft AS

Year

2003

Owned by

Solstad Farstad

Yard number

266

Designed by

Ulstein Design & Solutions AS

Ordered by

Farstad Shipping ASA

Principal dimensions

Length:
86.2 m
Beam:
19 m
Dead weight:
4927 tonnes
Draught (max):
6.65 m
Speed (max):
15 kn
Accommodation:
24 POB
Deck area:
960 sqm

Note: Subject to selected variant configuration

Capacities

Fuel oil (MDO):
1374 cbm
Fresh water:
735 cbm
Drill water:
590 cbm
Ballast water:
1739 cbm

Classifications

  • DnV + 1A1, SF, E0, DynPos AUTR, LFL*, CLEAN, COMF-V(3) (80%), DK(+), HL(+)

Ship history

First vessel of the ULSTEIN P105 design. Named "Far Symphony" at Skansekaia in Ålesund on 6 December 2003. Lady sponsor Mrs Margaret Farstad. One week later, the vessel left for Mongstad, and entered into service of the Hydro installations in the Norwegian sector of the North Sea. IMO 9288253.

2017: Received a one-year contract with Fairfield Betula on British area starting April 2017. 

From June 2017, Deep Sea Supply, Solstad Shipping and Farstad Shipping became one joint shipowning company: Solstad Farstad.

Please contact us for more information

Ulstein Verft AS

P. O. Box 158
NO-6067 Ulsteinvik
Norway

Tel: +47 7000 8000

gr@ulstein.com