BSO TBN II
Construction Service Operation Vessels (CSOVs) will be equipped with a hybrid battery propulsion system and be prepared for green methanol fuel to enable carbon-neutral operations.
Primary Specifications
The vessels, which utilise the TWIN X-STERN design, feature two sterns and main propellers located at both fore and aft, making them an ideal choice for Dynamic Positioning (DP) operations. Regardless of whether the vessels are facing towards or away from the weather, they maintain excellent operability without any restrictions on speed. With the TWIN X-STERN solution, the ships can achieve improved fuel efficiency while also minimising motion, the latter a crucial element for safety as the technicians need high-quality rest to perform their duties.
Milestones
Contract signed:Jun 2023
Steel cutting: Jan 2024
Keel lay: May 2025
Delivery: 2025
Get in touch
Kolbjørn Moldskred
- Description
- Sales Manager Newbuild
- Affiliation
- Ulstein Verft AS