J P Morgan

JPM TBN II

Construction Service Operation Vessels (CSOVs) will be equipped with a hybrid battery propulsion system and be prepared for green methanol fuel to enable carbon-neutral operations. 

Built By
Ulstein Verft AS
Year
2026
Yard Number
323

Primary Specifications

Length
89.6 m
Beam
19.2 m
Accommodation
132 POB
Note: Specifications may have changed since the original completion date.

The ships have a large, centrally positioned walk-to-work motion-compensated gangway and elevator tower for personnel and cargo transfers. Furthermore, a 3D compensated crane capable of 5-ton-offshore-cargo lifts is installed. The optimized on-board logistics includes large storage capacities and stepless approach to the offshore installations. 
 

Milestones

Contract signed: Jan -24

Steel cutting:  -24

Delivery:  -26

Kolbjørn Moldskred DSC4422 comp bw

Kolbjørn Moldskred

Sales Manager Newbuild

Affiliation
Ulstein Verft AS