ULSTEIN J102 jack-up vessel: Installation at Offshore Wind Farm, 15 MW turbines.

J102

Sized for most optimal and cost effective installation of 4-8 next generation wind turbines. As a vessel design in the X-JACK series, the vessel has a kite-shaped hull allowing for large leg spacings. The patented layout reduces weight by 10 to 15 per cent compared to conventional torsion box structures.

Primary Specifications

Length
142 m
Beam
87 m
VDL
10,500 mT
Crane capacity
2,500 mT
WTGs 8 MW
8 units
WTGs 15 MW
4 units
Accommodation
120 POB
Deck area
6,500 sqm

Additional Data

WTGs 12 MW
5 units
WTGs 17 MW
4 units
Main hook
2,500 mT @ 37 m
Main hook
1,250 mT @ 65 m
Main crane position
Around stern leg on centreline
Large spud cans
Reducing bearing pressure
Note: Subject to selected variant configuration
  • Top view of an ULSTEIN J102 jack-up vessel installing wind turbines.
  • Stern view of the ULSTEIN J102 jack-up vessel design.
  • The ULSTEIN J102 jack-up vessel is optimally-sized to take on heavy loads.
Ul

Ulstein Design & Solutions B.V.