JPM TBN I
Construction Service Operation Vessels (CSOVs) will be equipped with a hybrid battery propulsion system and be prepared for green methanol fuel to enable carbon-neutral operations.
Built By
Ulstein Verft AS
Year
2026
Yard Number
322
Primary Specifications
Length
89.6 m
Beam
19.2 m
Accommodation
132 POB
Note: Specifications may have changed since the original completion date.
The ships have a large, centrally positioned walk-to-work motion-compensated gangway and elevator tower for personnel and cargo transfers. Furthermore, a 3D compensated crane capable of 5-ton-offshore-cargo lifts is installed. The optimized on-board logistics includes large storage capacities and stepless approach to the offshore installations.
Milestones
Contract signed: Jan -24
Steel cutting: May -24
Keel laying: August -24
Delivery: Feb -26