Steel cutting ceremony, yard number 315, an offshore wind vessel for Bernhard Schulte.

Kick-off for the next vessel in offshore renewables

The steel cutting ceremony of yard number 315, the next offshore wind vessel for Bernhard Schulte, was carried out on 10 Sept 2018. Steel cutting is considered as first step of a newbuild project. The Service Operation Vessel (SOV) is of the SX195 design from Ulstein, and is destined to operate for GE Renewable Energy.
Published
10 September 2018
Share
  • Steel cutting of the yard number 315, the next SOV for Bernhard Schulte.

Les på norsk

The SOV vessel has been contracted to support the maintenance work by GE Renewable Energy at the offshore wind farm Merkur Offshore.

The vessel is the third SOV vessel from Ulstein to Bernhard Schulte. Based on the SX195 design, she is a longer version of the two previous vessels. More about the vessel.

X-STERN

Equipped with the X-STERN®, the vessel will have a strong advantage in her daily operations, as experienced with the first X-STERN vessel in history, the Windea La Cour, also owned by Bernhard Schulte, quoting:

"The X-STERN enables the vessel to run fast and efficient backwards, therefore, the vessel can choose the fastest way to the next turbine with either the bow or the stern first. During the first year in operation the X-STERN has met all expectations and it is amazing to see a vessel going backwards in bad weather without slamming and having spray on deck."

Latest news

Cruise ship Greg Mortimer
Feature

Why speed retention matters in expedition cruising

In expedition cruising, time at the destination is the product being sold. A vessel that arrives hours earlier at its destination creates more time for guest experiences. That time can be converted into additional landings, extra Zodiac excursions, more wildlife encounters and, ultimately, a richer expedition experience.