![Shanghai Electric SOVs of the SX195 and SX197 designs.](/imager/images/News/3438/ULSTEIN-SX195-Shanghai-Electric-Jan22-JointRender2-2_c36ea0a7a48d13e5607f2ed20023a877.jpg)
Accommodating 60 POB and 100 POB respectively, these designs are the future enablers to their owner, Shanghai Electric, providing high-efficient, robust, and state-of-the-art O&M service to the end customers. Both designs will focus on optimised operational capacity, capability and economy. With batteries installed, the vessels will provide a low emission footprint when servicing the renewable energy segment.
The two vessels had their steel cutting on 15 September 2022.
![Steel cutting SX195 and SX197 at ZPMC 20220913](/imager/images/News/3439/steel-cutting-SX195-and-SX197-at-ZPMC_20220913_c36ea0a7a48d13e5607f2ed20023a877.jpg)