Accommodating 60 POB and 100 POB respectively, these designs are the future enablers to their owner, Shanghai Electric, providing high-efficient, robust, and state-of-the-art O&M service to the end customers. Both designs will focus on optimised operational capacity, capability and economy. With batteries installed, the vessels will provide a low emission footprint when servicing the renewable energy segment.
The two vessels had their steel cutting on 15 September 2022.