Sarah-9118-A4 TH

Sarah (Skandi Constructor)

Inspection, Maintenance, Repair / Offshore Construction and Light Well Intervention Vessel. Diesel-electric propulsion system ensures excellent performance with regard to fuel consumption, sea keeping, station keeping, speed and cargo capacity.

Owned By
Sarah (Skandi Constructor)
Built By
Ulstein Verft AS
Year
2009
Yard Number
283
IMO Number
9431642
Operated By
DOF Subsea

Primary Specifications

Length
120.2 m
Beam
25 m
Dead weight
9100 tonnes
Draught
8 m
Speed
15 kn
Accomodation
100 people
Deck area
1380 sqm

Additional Data

Fuel oil (MDO)
2212 cbm
Technical fresh water
3150 cbm
Ballast water
6845 cbm
Note: Specifications may have changed since the original completion date.
Classifications: DnV1A1, SF, E0, DYNPOS-AUTRO, NAUT-OSV(A), LFLFuelled, CleanDesign, OPP-F, CRANE, COMF-V(3), COMF-C(3), HELDK, DK(+), HL(2,8)

Ship history

Delivered on 16 December 2009 to Marine Subsea Inc. The vessel was originally named "Sarah", but was sold to DOF Offshore in 2011, and changed the name to 'Skandi Constructor'. 
Sister vessel to Island Intervention.
Flag: Nassau, Bahamas
 

Milestones

2019: Awarded contract for Siemens' offshore wind project, the Beatrice offshore wind farm in the North Sea.

2021: Awarded a contract by Siemens Gamesa for projects on several offshore wind farms in Germany with a duration of up to 160 days, starting in April. The vessel has had a motion-compensated walk-to-work system installed. After the first project in the North Sea for Siemens Gamesa, Skandi Constructor will continue its work in the Baltic Sea, at the Wikinger offshore wind farm.

2023: Still active - IMO 9431642

 

Skandi Constructor, yard 283

Skipshistorie

Levert frå Ulstein Verft til Marine Subsea Inc. den 16. desember 2009. Skipet fekk først namnet Sarah, men fartøyet vart selt til DOF Offshore i 2011, og skifta då namn til Skandi Constructor. 
Systerskip til Island Intervention
Flagg: Nassau, Bahamas

2019: Tildelt kontrakt på Siemens sitt havvindprosjekt, Beatrice offshorevindfarm i Nordsjøen.

2021: Tildelt kontrakt av Siemens Gamesa for prosjekt på fleire havvindfarmar i Tyskland med ei varigheit på opp til 160 dagar, med oppstart i april.