Nexans Electra
This cutting-edge DP3 cable-laying vessel features a split turntable on deck capable of holding up to 10,000t of cable, an under-deck turntable with a 3,500t cable capacity, and a fibre optic tank holding 450t of fibre cable. When ‘Electra’ enters service in 2026, she will become a key resource in developing new renewable power and strengthening the energy infrastructure between countries.
Primary specifications as built
Additional Data
Ship history
The Nexans Electra, an ST-297 CLV design by Skipsteknisk, is an updated version of the Nexans Aurora, delivered in 2021. She is designed specifically to transport and lay high-voltage subsea cables, including cable bundles, and to support recovery and repair. She can perform effectively in challenging weather conditions and has exceptional characteristics in manoeuvrability and station-keeping.
Milestones
- 2023, Sep: Contract signed
- 2024, Jan:Steel cut
- 2024, Apr:Keel lay
- 2024, Sep:Grand block ceremony
- 2025, Jul: Hull arrival
- 2025, Nov: Meet the Project managers at Nexans and Ulstein Verft
- 2025, Nov:Launch from the dock hall
Specially developed cable‑handling equipment, a high degree of redundancy in critical systems, and great crew facilities are key to ensuring safe and efficient project execution. The first assignments in 2026 and 2027 will include both offshore wind projects and power‑exchange cables in the North Sea and the Mediterranean.