2024 06 24 Olympic Boreas Yno 318 CR ULSTEIN 5

Olympic Boreas

Construction Service Operation Vessel (CSOV) for the Offshore Energy (Wind, Oil & Gas) industry. Based on the TWIN X-STERN® with main propellers fore and aft. Hybrid battery propulsion and prepared for methanol fuel to enable low-emission operations. Winner of the 'Maritime Innovation Award', and a nominee for the 'Ship of the Year Award'.

Owned By
Olympic
Built By
Ulstein Verft AS
Year
2024
Yard Number
318
Operated By
Olympic

Primary Specifications

Length
89.6 m
Beam
19.2 m
Dead weight
2,300 tonnes
Draught (max)
5.9 m
Speed (max)
12.8 kn
Accommodation
126 POB
Open deck area
440 sqm

Additional Data

Deck area, in warehouse
500 sqm
Note: Specifications may have changed since the original completion date.
Classifications: DNV GL 1A, SF, E0, Offshore Service Vessel, Strengthened (DK, HA), DYNPOS(AUTR), NAUT (OC), Clean(Design), BWM(T), COMF-V(2), COMF-C(2), BIS, Recyclable, Battery(Power), ER(SCR, Tier III), SPS, Walk2Work, LCS

Ship history

In 2022, Olympic ordered two newbuild Construction Support Operation Vessels from Ulstein Verft. The vessels are among the first TWIN X-STERN vessels, operating in the offshore energy market. Ulstein Power & Control’s hybrid power solution incorporates a battery system and diesel generators operating at variable speeds to ensure optimal fuel utilisation. The power system also includes a shore power connection for battery recharging and emission-free port operations.

The vessels are prepared for methanol fuel, paving the way for low-emission operations. Space is also reserved for extra battery capacity, allowing full electric operations once the necessary infrastructure becomes available. 

The vessels accommodate 126 people in all daylight cabins. 

The gangway system enables the efficient transfer of personnel and cargo up to 2 tonnes at variable landing heights, 15-30 m straight and level. This modular system also includes a lift and a tailor-made tower.

The open deck area of 440 sqm and warehouse area of 500 sqm ensure ample capacity.

 

Milestones

2022 July: Contract signed

2022 September: Power solution contracted

2022 November: Steel cutting

2023 January:  Keel laying

2024 January:  Outfitting starts at Ulstein Verft

2024 June:  Sea trial completion

2024 July:  Delivery of Olympic Boreas

The Olympic Boreas was awarded the 'Maritime Innovation of the Year 2024', and was one of three nominees for the 'Ship of the Year 2024' Award.

The complete project process for Olympic Boreas and the sister vessel, Olympic Notos: Constructing Olympic's first CSOV TWIN X-STERN vessels | Ulstein

IMO 9977787

Get in touch

Geir Heltne DSC4460 comp bw

Geir Heltne

Description
Sales Manager
Affiliation
Ulstein Design & Solutions AS
Kolbjørn Moldskred DSC4422 comp bw

Kolbjørn Moldskred

Description
Sales Manager Newbuild
Affiliation
Ulstein Verft AS
Geir Heltne DSC4460 comp bw

Geir Heltne

Sales Manager

Affiliation
Ulstein Design & Solutions AS
Kolbjørn Moldskred DSC4422 comp bw

Kolbjørn Moldskred

Sales Manager Newbuild

Affiliation
Ulstein Verft AS